Past Projects
Nutricon has been involved in various landmark projects across Victoria and the Northern Territory since 2008. Being a part of delivering great projects with various clients has enabled us to develop effective and industry proven methods along the journey.
Western Program Alliance
Construction and traffic staging plans and short to long term programming to provide visibility on critical pathway to switching live traffic onto the new rail overpass.
This was undertaken hand-in-hand with the initiation of design changes to gain efficiencies in resources and time.
Monash Freeway Upgrade S1 & S2
Stage 1 - managed and delivered 8 freeway ramps from Stud Rd, Clyde Rd interchange to Koo Wee Rup Interchange.
Stage 2 - provided project planning for the Beaconsfield Interchange stockpile management and O’Sheas Rd Interchange.
Western Roads Upgrade
In the early phase managed the clash detection process to identify design clashes with services, initiated design corrections and managed transition of information to delivery teams.
Subsequently transitioned into CPS design management and prioritisation of RFI’s process to align with program constraints.
North East Link
Preparation of TAN’s, constructability studies and staging plans in the Primary Package tender; Cut and Cover tunnel including civil and structures between Yallambie Rd and Lower Plenty Road.
This was undertaken along with strategic staging of interfaces between the Primary Package and Secondary Packages adjacent the M80 Interchange.
CityLink - Tulla Widening
Delivery of the new Bulla Rd bridge, new inbound entry ramp and the new collector distributor, both civil and structures package of works.
Temporary works coordination, procurement and execution to suit site constraints.
Peninsula Link
Installation of a total of 51 static and ITS gantry signs along 27 km of new freeway including multiple entry and exit ramps.
Coordination of short and long term traffic guidance schemes across the whole project.
INPEX - LNG Project
Based in Darwin, Northern Territory
Delivery of civil and structures works packages for the new onshore LNG processing facility at Bladin Point. Managing interdisciplinary interfaces as well as coordination of works with external electrical and mechanical contractors.